Guide · UK · as of 3 Nov 2026

Digital waste tracking: who records what, from when.

Short answer

Digital waste tracking is the government’s online service for recording waste movements. Since 1 October 2026, permitted sites in England and Wales record every load they receive within two working days.

Scotland and Northern Ireland follow in January 2027; carriers, brokers and dealers record their own movements from October 2027. Waste transfer notes and consignment notes continue meanwhile.

Receipt of waste · Millbrook tipdue Mon
Received
Thu 1 Oct 2026 · 09:14
Waste
EWC 17 09 04 · mixed construction and demolition
Carrier
Northmill Skips Ltd
Weight
6.42 t · ticket 4481
Record by
end of Mon 5 Oct · 2 working days
Illustration. Names are fictional.

evreka.ai is an evreka.co product.

  • Ford Otosan
  • Zorlu Tekstil
  • Turkish Red Crescent
  • Bell Holding
  • TerraCycle
  • Holland America Line
  • ALBA
  • Averda
  • 12 years in waste operations
  • 30+ countries
  • 10,000+ users

UMUTCAN APPROVAL: 30+ countries (evreka.ai) vs 25+ (evreka.co); align before launch

The dates

Which dates apply to you?

England and Wales unless marked. Checked on 3 November 2026.

WhenWhat happensWho it applies to
28 Apr 2026donePublic beta opens. Receiving sites can report voluntarily.Receiving sites
1 Oct 2026in forceMandatory in England (SI 2026/729) and Wales. Each load is recorded by the end of the second working day after receipt.Permitted receivers: tips, transfer stations, treatment sites
Autumn 2026Private beta for carriers, brokers and dealers.Carriers, brokers, dealers
Jan 2027nextReceiving sites in Scotland and Northern Ireland start.Receiving sites
Spring 2027Public beta for carriers, brokers and dealers.Carriers, brokers, dealers
Oct 2027mandatoryYou record your own movements, through software or a spreadsheet.Carriers, brokers, dealers
Until further noticeWaste transfer notes and consignment notes continue beside the digital record.Everyone who moves waste
  • £26service charge a year
  • £1,000fixed penalty
  • No upper limitvariable penalty
  • Prosecutionunlimited fine

Sources are listed at the end of the page. A summary, not legal advice.

The record

What goes into each record?

The receiving site records what arrived and who brought it. Each record carries the EWC code and the carrier’s details, with POPs or hazardous data where they apply.

Scope

Who is in scope?

The Scottish Government’s impact assessment counts 11,765 receiving sites and 117,853 carriers, brokers and dealers in scope across the UK.

Most are small. The Regulatory Policy Committee counts 71.5% of businesses in scope as micro firms and 21.5% as small.

Government estimates put software at about £158 a year per business, plus 4 to 8 hours to learn the service.

Software

Which software can report to Defra?

Defra publishes a list, “Report receipt of waste: choose a software provider”. On 23 October 2026 it had about 238 rows, up from 25 in July. The list says it is not exhaustive.

A straight answer. evreka.ai is not on the list (23 October 2026 version).

It drafts each record from your jobs, lifts or intakes and flags loads still open on day two. You submit through the government service or your listed software. UMUTCAN APPROVAL: Defra listing; integrate with the Receipt of Waste API and apply for the list, or keep “sits on top of your listed system”

Paperwork

Are transfer notes going digital?

Not yet. Waste transfer notes and consignment notes continue until further notice, beside the digital record. Until Defra says otherwise, you run both.

Also in 2027

What else changes for carriers?

Carrier, broker and dealer registration is being replaced by standard-rules permits. There are three types: controller, transporter, or both. Skip firms are named as controller-transporters.

Permits need technical competence and renew every three years. The permit number must appear in your adverts.

The policy paper of 22 August 2025 set no go-live date. Clyde & Co expect it fully in force during 2027, with a 12-month transition.

Upper-tier carriers move over at renewal, across about three years. Lower-tier carriers apply within 12 months.

Your operation

What it means for your operation

  • Skip hire

    Your tip already records you.

    Each skip you tip is recorded within two working days, with your carrier details. If your transfer station in England or Wales holds a permit, you have been a receiver since 1 October 2026.

    One day in a skip yard →
  • Commercial collection

    Every round ends in a record.

    The tip records each round’s load now. From October 2027 you record every movement yourself, while transfer notes and consignment notes continue.

    One round, start to finish →
  • ITAD and AATF

    Every inbound load, recorded.

    An AATF, or an ITAD site receiving waste under a permit, must record every inbound load within two working days. That sits beside your quarterly WEEE Online returns.

    One client lot, end to end →
From the yard and the round

Four mistakes we see

  • Thinking it starts for you in 2027

    Your tip has recorded your loads, with your carrier details, since 1 October 2026.

    Instead: send every load with its EWC code, so the tip’s record matches yours.

  • Recording loads at the end of the week

    A receiving site has two working days per load, and a breach can cost a £1,000 fixed penalty.

    Instead: record at the weighbridge, the day the load arrives.

  • Dropping the transfer note

    Transfer notes and consignment notes continue until further notice.

    Instead: keep issuing them; the digital record runs beside them.

  • Leaving the permit reform until renewal

    Registration becomes a three-year permit that needs technical competence.

    Instead: prepare the competence evidence and fee for the permit application now.

Questions

What operators ask first

I only carry waste. Do I need to report yet?

Not until October 2027. A private beta runs from autumn 2026 and a public beta from spring 2027. Until then, the sites you tip at record your loads.

How quickly must a receiving site record a load?

By the end of the second working day after receipt. That has applied in England and Wales since 1 October 2026; Scotland and Northern Ireland follow in January 2027.

What does it cost, and what are the penalties?

The service charge is £26 a year. A breach can bring a £1,000 fixed penalty, a variable penalty with no upper limit, or prosecution.

Can I report with a spreadsheet?

Yes. Records can go in through software or by spreadsheet, and the spreadsheet route stays until at least October 2027.

Is evreka.ai on Defra’s software list?

No, not on the version of 23 October 2026. evreka.ai drafts the records from your jobs; you submit through the government service or your listed software. UMUTCAN APPROVAL: same Defra listing decision as the straight answer above

The 20-minute call

Twenty minutes on your records.

Umutcan Duman
Umutcan DumanFounder and CEO, evreka.ai

What you get in 20 minutes

  1. Your loads, checked. Which fields your job records already carry, and which are missing.
  2. Your dates. Receiver since 1 October 2026, carrier from October 2027, or both.
  3. A straight answer on software. Where evreka.ai fits beside the government service or your listed software.

Free. No preparation needed. Google Meet, in English. UMUTCAN APPROVAL: who takes the English calls (the 20-minute Cal.com event operations-call is live)

Calendar

Umutcan’s free times open here.

Pick a time; the Google Meet link arrives by email.

Calendar not opening? Email umutcan@evreka.co

Prefer email? Send Umutcan one line about your operation: umutcan@evreka.co

Book a 20-min call